Finland Openarms!

{EAV:986fbbccfbb0df81}

WE WANT TO EMBRACE THE WORLD FROM FINLAND !

WELCOME TO FINLAND OPENARMS!

Sergio from Italy. Suomenllinna – Helsinki Openarms!

Population: 5.4 million, 15.8 inhabitants per km² (40.5 per square mile)

Juliana from Brazil. Turku Openarms!

Life expectancy: Men 76 years, women 83 years

The Helsinki Cathedral. Helsinki Openarms!

Languages: Official languages are Finnish (spoken by 91%) and Swedish (5.4%). Sámi is the mother tongue of about 1,700 people, members of the indigenous Sámi people of northern Lapland

Religion: Christianity; 79.9 % Lutheran and about 1.1% Orthodox. In practice society is fairly secularised

Independence: Declared on December 6, 1917. Previously a grand duchy in the Russian empire for 108 years, and a part of Sweden for 600 years before that

Form of government: Republic, parliamentary democracy

Parliament: 200 members in one chamber, elected every 4 years in a direct vote (next elections in 2015)

Cabinet: Multiparty coalition cabinet. The current Cabinet is run by Prime Minister Jyrki Katainen

Head of State: President of the Republic, elected every 6 years, two-term maximum. Currently Ms Tarja Halonen, first elected in 2000

International cooperation: Member of United Nations since 1955 and European Union since 1995

Key features: High standard of education, social security and healthcare, all financed by the state

GDP per capita: 33,618 euros (2010)

Main exports: Electrotechnical goods, metal products, machinery, transport equipment, wood and paper products, chemicals

Main imports: Raw materials, investment goods, energy, consumer goods (for example cars and textiles)

Currency unit: Euro

Area: 338,424 km² (131,985 square miles), the fifth-largest country in Western Europe

Greatest length from north to south: 1,160 km (720 miles)

Greatest width from east to west: 540 km (335 miles)

Capital: Helsinki (1.25 million inhabitants in metropolitan area)

Climate: Great contrasts – cold winters and fairly warm summers (2011 extremes: coldest day in Salla -41.8 C/-43.2 F, warmest day in Ylitornio 32.8 C/91.0 F)

We are waiting for your pictures. You can send them to theopenarms@ymail.com

Advertisements

One thought on “Finland Openarms!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s